MTO Class Environmental Assessment (EA) Process

Contracts A and B are following the approved planning process for a ‘Group B’ in accordance with the MTO Class EA for Provincial Transportation Facilities (2000).  The two contracts are proceeding along different design and construction timelines and will therefore each follow a separate MTO Class EA Group B process.  A Public Information Centre is planned for Contract B at a future date and advance notification will be provided.

Contract A

A Design and Construction Report (DCR) has been prepared to document the study process completed for Contract A including the recommended detail design improvements, anticipated environmental impacts and proposed mitigation measures as well as the consultation undertaken throughout the process.

The Contract A DCR can be accessed on the Documentation page

Contract B

A separate Design and Construction Report (DCR) will be prepared to document the study process completed for Contract B including the recommended detail design improvements, anticipated environmental impacts and proposed mitigation measures as well as the consultation undertaken throughout the process.

The DCR for Contract B will be made available at a future date and will be placed on the public record for a 30-day comment period. Notification regarding the availability of the report will be provided.

May 2021

Notice of Study Commencement

CONTRACT A (GWP 2146-20-00)

Highway 401 / Wilson Road Overpass Replacement Design and Construction Report (DCR)
30 day comment period - April to May 2024

CONTRACT A (GWP 2146-20-00)

Highway 401 / Wilson Road Overpass Replacement
Construction Start - Fall 2024

CONTRACT B (GWP 2106-19-00)

Highway 401 / Bloor Street / Harmony Road Interchange Reconstruction
Public Information Centre - Spring 2026

CONTRACT B (GWP 2106-19-00)

Highway 401 / Bloor Street / Harmony Road Interchange Reconstruction
Design and Construction Report (DCR)
30 day comment period - 2026

CONTRACT B (GWP 2106-19-00)

Highway 401 / Bloor Street / Harmony Road Interchange Reconstruction
Construction Start - 2028

Skip to content
Privacy Overview
Abstract logo illustration with a curved blue shape and a yellow stripe, symbolizing a highway or road.

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.